Preparing Offshore Platforms for Decommissioning
Beacon West’s rigorous planning, cross-disciplinary engineering, HSE, and field execution expertise offer safe, compliant, and cost-effective solutions tailored to each platform’s condition and configuration.
Milestone Achieved: Platform Holly “Hardening”
Beacon West is proud to share that Platform Holly has reached a major milestone – the “hardening” (or cold stack) phase.
PRC 421 Pier & Caisson Decommissioning
Beacon West managed the removal of two 1930s vintage piers and caissons from the surf zone offshore Goleta.
Platform Grace Decommissioning Preparation
Beacon West Energy Group is immensely proud of its role in providing engineering support during the preparation of decommissioning Platform Grace.
ConocoPhillips Decommissioning Study
Beacon West conducted a fast-paced facility evaluation and strategic plan for the decommissioning of the Carpinteria Offshore field wells, platforms, pipelines, and onshore facilities.
Carpinteria Pipeline System De-Inventory and Abandonment Project
Beacon West operations and engineering personnel managed the flushing of a segment of the Carpinteria Pipeline System.