PROJECTS
Former Venoco Line 96 Abandonment Project
Beacon West completed a significant decommissioning milestone with the safe and permanent abandonment of the former Ellwood Pipeline Inc. Line 96.
Carpinteria Pipeline System De-Inventory and Abandonment Project
Beacon West operations and engineering personnel managed the flushing of a segment of the Carpinteria Pipeline System.
Platform Holly Clear Deck Project
The Beacon West engineering and operations team developed detailed agency-approved procedures and routinely perform maintenance pigging of the Platform Holly to shore pipelines.
Goleta Water District Electric Safe Work Practices and Facility Reviews
Beacon West performed an engineering review of the Goleta Water District’s Electric Safe Work Practices and Arc Flash Safe Practices to review compliance with the most recent electrical codes and to help ensure safe electrical practices for the District’s personnel.
Legacy Well Re-Abandonment Permitting & Mitigation Monitoring
Beacon West provides CEQA, Permitting, Compliance, and Safety support for legacy well re-abandonments offshore Summerland, CA.
Hazardous Materials / Waste Management Permitting & Compliance
Beacon West personnel conduct ongoing waste management compliance to property handle and dispose of operations non-hazardous, recyclable, universal and hazardous wastes, and offsite transportation and disposal of waste streams generated at onshore and offshore facilities.
Goleta Water District - Corona Del Mar Reservoir THM Project
Beacon West personnel performed electrical and instrumentation (E&I) engineering design and E&I construction observation services for this reservoir trihalomethanes (THM) removal and booster pump facility.
Platform Automation - SCADA System Modifications and PLC Management
Beacon West Instrumentation and Automation Specialists developed breathing air monitoring systems for multiple platforms in the Santa Barbara Channel to allow for the safe operation of standby air volume.
Platform Fire & Gas Monitoring and Maintenance Systems
Beacon West instrumentation specialists implemented a project to replace 40-yr old vintage catalytic bead (CB) Combustible Gas Detectors and UV Fire Detectors throughout multiple offshore platforms.
Pipeline Maintenance and Pigging Operations
The Beacon West engineering and operations team developed detailed agency-approved procedures and routinely perform maintenance pigging of the Platform Holly to shore pipelines.
Coastal Pier Inspection, Maintenance and Underwater Pile Repairs
Beacon West manages inspection and maintenance services on multiple working piers along the central California coast.
Santa Barbara County Toro Canyon Seep Solution Engineering Study
Beacon West developed short and long-term solutions to manage a seep in Toro Canyon.